Our solutions on construction site : Electricity
Our products on construction site : Micro-trenchers
Location : MARNE 51 Marne - 51
Client : Wind Farm Connection - Marne (France)
Location: MARNE 51 Marne - 51
Customer : GTIE Chateau Thierry
Service : Rental
Date: September 2023
Customer Challenge :
For the HTA (High Tension Alternating current) connection of the wind farm in the Coolus area of Marne, we laid two reinforced aluminium cables of 240mm², covering a distance of 14 kilometres.
The trenching and mechanical laying were performed in a trench 280 mm wide, with the cables stacked at a depth of 1.10 meters. The deployment required the use of a GD2-TRN 184 plus directional drilling to cross some roads. The ground in all the area was mainly composed of clay-limestone and chalk.
Furthermore, due to the presence of fiber and water networks, the trencher was obliged to move on tracks for over a distance of 500 meters in the middle of the project.
Solutions :
The machine used was the GD2 TRN184. This mechanical laying solution, based on overlaid cables and hydraulic backfiller, allowed for an adaptive backfilling of the trench depending on the availability of excavated materials.
The accessories used with the machine enabled a tailored laying solution as well as an optimization of the project in terms of time and restoration of the paths.
Results :
Testimonial
"There was a very good reactivity from Marais, from the offer to planning and then execution. Contact with the trencher operators was easy and they adapted themself very well to our project" says Sophie Carrinhi, Machinery Business Manager.
Machine
Marais SA
Zone d'activité "Les portes de l'Anjou"
1, rue Pierre et Marie Curie
49430
Durtal - France
Phone +33 2 41 96 16 90